In March 2011 a drilling program was conducted over the VMS-Au properties near Cochrane, ON. The drilling program was contracted to Total Exploration (Timmins, ON) and included two drill holes: DH-01 (102 meters) and DH-02 (104 meters).
The drilling was carried out in the period between March 16, 2011 and April 05, 2011. Both drill holes were designed vertically with 30 and 34 meters of casing for DH-01 and DH-02 respectively. Drilling was carried out using diamond drill BBS 1, equipped by Perkins diesel engine. The diameter of the drill holes was 1 inch. Drilling showed good core recovery and intersected mineralized zone in DH-02 at depth of 82 meters, which was followed with minor disruptions to the depth of 104 meters.